mbarrick: (Default)
[personal profile] mbarrick

The asbestos shack has been gone for a while. New wiring has been run to all the apartments now and they have begun to work on the new ceiling. Note the exit sign hanging by wires. It's just so "Blade-Runner".



A closer look at some of the hanging wires to be hidden by the new ceiling.



The view from the other direction. The dusty path on the floor is because that apartment is having all of the plaster ripped out because of water damage and being completely rewired in the process. The big black cable is the new main feeding into the breaker-box.

January 2026

S M T W T F S
    123
45 67 8910
11 121314 15 16 17
18 19 20 21 22 2324
25262728293031

Expand Cut Tags

No cut tags
Page generated Jan. 26th, 2026 06:38 pm
Powered by Dreamwidth Studios